In a chip lab, you often see a counterintuitive scene: in summer the air handler is cooling and dehumidifying on one side and heating on the other—air is first cooled to a lower dew-point temperature, then heated back up to a temperature that can be supplied to the room. That is not a design error. It is the usual price of tying temperature, humidity, and cleanliness to a single unit.
The takeaway: a more reliable approach is to split the three jobs. Use a makeup air unit (MAU) for humidity and positive pressure, and treat outdoor air to the required dew point. Use a dry cooling coil (DCC) for room sensible heat, with a supply-water temperature above the served space’s current actual dew point, so the coil stays dry and cools without dehumidifying. Use fan filter units (FFUs) for circulating airflow and filtration, and thus for cleanliness. Split chilled water into two loops: lower-temperature water for deep dehumidification of outdoor air, and medium-temperature water for outdoor-air pre-cooling and room sensible heat. Reheat should recover condenser heat first, rather than forcing the job with electric heat. The actual water temperatures, dew point, airflow, and equipment arrangement must follow process requirements, the project design, and manufacturer data. Do not treat one project’s capacities or unit counts as universal design values.
This article discusses, from the standpoint of NUNXIN (暖心自控)’s work on cleanroom temperature, humidity, and controls, why this architecture can cut the wasted work of cooling and then reheating, and which ideas are worth borrowing. It does not cite third-party site cases, and it does not turn another project’s floor area, exhaust airflow, or unit cooling capacity into numbers that every chip lab should copy.
Why is chip-lab air-conditioning so demanding?
A chip lab’s floor area often is not especially large, but for the HVAC engineer it is usually much harder to serve than ordinar