A cleanroom air-conditioning system must hold cleanliness, temperature/humidity and pressure differential at the same time. Following the single-return-air AHU route, this guide explains why the sections are arranged the way they are, which five unit parameters matter in selection, how the six system parameters are derived, and which variables and sensors matter in operation.

— 暖心技术团队

The air-handling system serving a cleanroom is called a purification air-conditioning system in China's GB 50073-2013 Code for Design of Clean Rooms. Unlike comfort air conditioning, it cannot manage temperature and humidity alone; it must hold three targets at once: cleanliness, temperature/humidity and room pressure differential. The core equipment of a central system is the modular air handling unit (AHU).

GB/T 14294-2008 defines a modular AHU as air-handling equipment assembled from functional sections, for systems with a resistance of at least 100 Pa. By application, the standard divides units into general, fresh-air, clean (purification) and special-purpose units; clean plants use the clean type.

1. Choose the system layout first: three common routes

LayoutTypical useCharacteristics
AHU with single return air + ductwork + HEPA terminalsISO Class 6-8Low investment; temperature and humidity are controlled jointly in one return-air loop
MAU + FFU + DCCISO Class 1-5 and high-precision spacesThe MAU (make-up air unit) sets the dew point, the DCC (dry cooling coil) handles sensible heat, FFUs (fan filter units) cover the ceiling
MAU + RAU (recirculation units)Multi-room plants with very different zone conditionsOne recirculation unit per zone; flexible zoning

Most electronics assembly and pharmaceutical support areas use the first layout, so the rest of this article follows the single-return-air AHU route.

2. Sections are combined as needed, but their order follows a logic

An AHU has no fixed set of sections. GB/T 14294-2008 lists mixing, flow equalizing, filtration, cooling, primary and secondary heating, dehumidification, humidification, supply fan, return fan, water spray, sound attenuation and heat recovery; each project selects them by l